Investment Summary
property was half way already done, Complete exterior vinyl siding., there is 4 bedroom and we are making that to 3
bed room truning 2 small bedroom to master bed room. Remove wall in bedroom and make a single large master
bedroom with in suit bathroom. Install can lights in both areas. Install all new bathroom fixtures., Remove living
room ceiling and install new can lights and install new drywall. Install new flooring throughout., Remove all kitchen
cabinets and open up 2 walls to give open concept. Install new white shaker soft close cabinets and granite counter
tops., Reframe other bathroom and install new entry door and double vanity,. Paint basement walls and floor and
repair hole in floor., Paint all walls and ceilings and install new carpets in all bedrooms., Install new drywall where
needed throughout house. Trim out all windows and floors where needed.