Investment Summary
The existing structure will be demoed leaving one existing wall. The new foundation will be dug and poured. A new structure of approx 3,116 square fuilt will be framed , sheathed and sided. A new roof will be installed .New windows and doors to be installed. New kitchens, baths will be completed including tile and fixture credits. New hardwood floors to be installed with interior doors and trim. Entire structure to be painted and cleaned for delivery.